CONSTRUCTION PROJECTS OUT FOR BID

Project:  2018 13th Street Water Main Relay Project (8th-10th Avenue)

Bid Date:  March 29, 2018 @ 2:30 p.m.
10% bid bond

Plans will be available starting on Wednesday, Feb. 14, 2018.

The general nature of the work on which bids are requested is:  Relay 825 LF of  6” PVC Water Main, remove and replace 170 SY 6” PCC Driveways, install valves, fire hydrants and miscellaneous related work and appurtenances in accordance with the contract documents.

Work shall be completed by Nov. 2, 2018.

Liquidated damages in the amount of $300 per working day will be assessed for work not completed within this time.

Engineer’s Estimate:  $131,500

 

Plans are available from City of Marion Water Department – 1225 6th Avenue, Suite 150, Marion
Hours: 8 a.m. – 5 p.m.
Plans available in paper or by PDF format.
No plan deposit is required.
A $10 fee (due before shipping) will be charged if shipping is requested.

 

For plans and project questions contact:
Todd Steigerwaldt  
ph. (319) 743-6311
email


INFORMATION FOR DEVELOPERS AND CONTRACTORS

The Marion Municipal Water Works are governed by the Rules and Regulations Governing the Municipal Water Works in the City of Marion. 

Please use the Marion Water Department Water Main Application Form  for all new water main installations in Marion.  Please have this filled out along with the Department of Natural Resources (DNR) water schedule forms when the plan of improvements plan sets are initially submitted for department review and comments. There is a $50 charge for plan review per application.

Our Schedule of Fixed Charges covers current fees for meters, service calls and various other charges.  Some of the most common fees are:

   $200 per tap plus materials on all new water mains.  Water department installs taps up to 2" in diameter. 

   $279 + tax for new 3/4" water meter for all new homes and businesses (price depends on meter size) 

   $1.00 per linear foot for new water main installation or $500 minimum charge which covers inspection and 

   testing costs 

DESIGN STANDARDS

Metro Design Standards for Water Main

Metro Standards and Specifications

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer